Our story begins in 1994. Michael was two years old, with not yet a thought of home improvement in his burgeoning little mind. Josiah, you might say, was still under development, yet to be born. We must begin our story here because this was the year Coghlan Painting, started by Michael’s father, Pat, evolved from a small window-cleaning operation into an equally small painting company. More people in Pat’s circle seemed to be interested in hiring a house painter than a window cleaner, and the business followed the demand. From that point forward, through the late 2010s, this would become the theme of what eventually grew into Coghlan Enterprises.

Three workers pose beside a white van advertising Croghan Painting and a phone number.

Our Process

If you’re here reading this because you’re interested in our process and therefore in working with us, thank you! We hope it works out as we’d enjoy the opportunity to work with you and take on your project.

Hand pressing buttons on a black office desk phone with handset lifted

01 Contact Us

After contacting us with your name, callback number and scope of work, we’ll do our best to reach out to you within two business days to learn more about you and your project and set up a time for an initial consultation.

Two people reviewing architectural blueprints in a bright office, one pointing toward something offscreen.

02 — Initial Consultation

At the consultation, we’ll be able to set eyes on the site of your envisaged remodel and discuss particulars. Once we bid adieu, we’ll get straight to presenting you with an estimated cost to see if we’re within your budget; if you decide that we are and wish to move forward, we’ll all do a little shimmy and then we’ll follow up the estimate with a proper bid, which will take us about a week, sometimes two depending on the complexity of your project, to generate.


For some projects, we can skip the ballpark figure and jump straight to presenting you with an actual bid. The duration of the bid is contingent on the complexity of the project, depth of work provided by our subcontractors, and permitting (if the job requires a permit). With kitchen remodels, we’ll include, for a slight fee, a digital 3-D architectural rendering of your project.


Hands pointing at a signed document beside a small house model on a desk

03 — Proposal Accepted

If you accept our proposal, we’ll get to work on design details and help with material choices or pair you with one of the designers with whom we work in tandem. Moreover, we’ll discuss scheduling and collect a deposit.

Three construction workers in hard hats inspect a room, one holding plans and another pointing upward.

04 — Pre-Construction

Prior to beginning your project, all client-responsible materials should be on site or in transit. Any materials that require special orders on our part should also be on site or in transit.


In addition to obtaining the materials, we’ll ensure the subcontractors are scheduled and, if necessary, the permit is secured (such are the GC responsibilities). Once we commence, you will be our foremost focus.


05 — Demolition & Rough-Ins

The first week primarily entails demolition, followed immediately by the rough-ins of the subcontractors.

Hands assembling a white sink drain amid scattered plumbing tools on a workbench

05 — Demolition & Rough-Ins

The first week primarily entails demolition, followed immediately by the rough-ins of the subcontractors.

Person standing on a ladder in an unfinished room with drywall, tools, and materials on the floor

06 — Construction

After the subs have completed the first round of their work, we’ll begin construction, which will include framing, sheetrocking and, in the case of bathroom remodels, waterproofing.


Once construction is completed, we can start the installation phase.

Workers smoothing large dark floor tiles during construction work

07 — Installation

During the installation phase, we install any tile or flooring, cabinets and countertops and so on.

05 — Demolition & Rough-Ins

The first week primarily entails demolition, followed immediately by the rough-ins of the subcontractors.

Plumber repairing a sink drain under a bathroom basin with a wrench

08 — Trim-Out

After the installation, the subcontractors would return for their trim-out, which is round two for them and consequently their final round.

With the subcontractors wrapped up, we begin the last phase of your project: completion!

Small modern bathroom with white sink, toilet, gray walls, and teal accents.

09 — Completion

Throughout the renovation process, either at the end of each phase or, depending upon the length of the project, several times during each phase, we collect payment installments.



Once we’ve looked over your newly updated space together, scrutinizing and gawking over the details, and all is as it should be, we’ll collect the final payment and turn it over to you for your reinstated and prolonged enjoyment.


01 — Contact Us

After contacting us with your name, callback number and scope of work, we’ll do our best to reach out to you within two business days to learn more about you and your project and set up a time for an initial consultation.

02 — Initial Consultation



03 — Proposal Accepted

If you accept our proposal, we’ll get to work on design details and help with material choices or pair you with one of the designers with whom we work in tandem. Moreover, we’ll discuss scheduling and collect a deposit.

04 — Pre-Construction

Prior to beginning your project, all client-responsible materials should be on site or in transit. Any materials that require special orders on our part should also be on site or in transit.



In addition to obtaining the materials, we’ll ensure the subcontractors are scheduled and, if necessary, the permit is secured (such are the GC responsibilities). Once we commence, you will be our foremost focus.

05 — Demolition & Rough-Ins

The first week primarily entails demolition, followed immediately by the rough-ins of the subcontractors.

06 — Construction

After the subs have completed the first round of their work, we’ll begin construction, which will include framing, sheetrocking and, in the case of bathroom remodels, waterproofing.



Once construction is completed, we can start the installation phase.

07 — Installation

During the installation phase, we install any tile or flooring, cabinets and countertops and so on.

08 — Trim-Out

After the installation, the subcontractors would return for their trim-out, which is round two for them and consequently their final round.

With the subcontractors wrapped up, we begin the last phase of your project: completion!

09 — Completion

Throughout the renovation process, either at the end of each phase or, depending upon the length of the project, several times during each phase, we collect payment installments.



Once we’ve looked over your newly updated space together, scrutinizing and gawking over the details, and all is as it should be, we’ll collect the final payment and turn it over to you for your reinstated and prolonged enjoyment.

About Cedar Creek Building & Design

Phasellus magna velit, mattis a tellus ut, sollicitudin commodo est. Curabitur tincidunt facilisis magna convallis convallis. Nulla sit amet tincidunt nibh, quis hendrerit sem. Pellentesque a orci eget ex semper lobortis. Phasellus fringilla lorem tincidunt ullamcorper luctus. Sed bibendum tempor sapien, in rutrum tortor pellentesque sed. Fusce pharetra lacinia eros in egestas. Pellentesque vitae facilisis lacus, in rutrum magna. Mauris ornare semper consectetur.

Plain white horizontal rectangle with a thin gray border line

About

Cedar Creek Building & Design specializes in kitchen and bathroom remodeling, custom cabinetry, cabinet refinishing, new construction, and home rehabilitation. Inspired by the strength and longevity of the eastern red cedar, we proudly serve Williamsburg and surrounding communities.

Languages

  • English

Payment Methods

  • American Express
  • Cash
  • Check
  • Discover
  • Mastercard
  • Visa
  • QuickBooks

Services

  • Bathroom Remodeling
  • Kitchen Remodeling
  • Custom Cabinetry
  • Cabinet Refinishing
  • Deck Construction
  • Interior Trim Installation
  • Four Season Room Additions

Specialities

  • Bathroom Remodeling
  • Kitchen Remodeling
  • Custom Cabinetry
  • Cabinet Refinishing

Good to Know

Service options

  • Onsite services

Planning

  • Appointment required